Abstract
To emphasize the extent to which theoretical research results are consistent with the real phenomenon it is necessary to carry out an experimental study. It has been the design and implementation of an unconventional model of drilling equipment designated to simulate digging wells and it is provided and structure driving to unconventional maneuver system. The model is similar to the drilling rig for unconventional drilling. The choice was not random, because there were concerns about research and design of a similar installation in the design institute and UPG Ploiesti, the unfinished project model was not verified yet. To verify some of similarity must be some acceptable degree of geometric similarity, kinematic and dynamic with the real unconventional rig used at UPG Ploiesti.